Background:-
We have been closely monitoring the crack that appeared in the south aspect of the Chancel wall since it appeared in early April 2026. Please find the images underneath and a link to the structural engineers report report from September 2026.
Structural Monitoring April Thru September 2026.
Images Of The Defect Over The Monitoring Period.
Hover Over Any Image For An Expanded View.
The Structural Engineers Report, Can Be Downloaded From The ‘Downloads’ Page By Clicking Here.
Images copyright 2026 Graeme, L.R.P.S.
A Selection Of Images And The Structural Report On The Defect In The South Aspect Of The Chancel Wall.
| About |
| Cookie policy |
| Flower Meadow |
| How to find us |
| Rectors |
| Rota |
| Flower Names |
| Lectionary Readings 2026 |
| Burials AB - BL |
| Burials BL- CR |
| Burials DA - EA |
| Burials EA - GR |
| Burials GR - LA |
| Burials LA - ME |
| Burials ME - PI |
| Burials PI - ST |
| Burials ST - WR |
| Burials Img |
| Gift aid |
| Fundraising |
| Structural Report |
| Electoral Roll |
| Roll F A Q |